Revision 5
19
th
January 2021
Page | 25
EU DC Fast Charger (50kW & 100kW)
INSTALLATION AND USER’S MANUAL
This document is the
Property of BTCPower
Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
3)
There is an input terminal block below it. Correctly connect the input line to match
each phase (L1, L2, L3, N)
Power Wiring:
•
Ground wire, at minimum length 600mm, of KIV 1x25mm2, to be connected
into the earth terminal marked with ground symbol using M8.0 screws with
torque of 4.0 N-m
•
Power wires, at minimum length 600mm, of 4 x KIV 4x70mm2, to be
connected with cable lugs to the copper bar on the input terminal marked
with “L1, L2, L3 or N” using 4 x M8.0 screws with torque of 3.5 N
-m
Ethernet:
•
Standard Ethernet cable, at minimum length 2000mm, with RJ45 male
connector
4)
Turn on the main breaker and control breaker