Revision 5
19
th
January 2021
Page | 23
EU DC Fast Charger (50kW & 100kW)
INSTALLATION AND USER’S MANUAL
This document is the
Property of BTCPower
Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
4)
Connect and secure hoist ropes to the four (4) eye bolts. (eye bolt : M16, SUS304)
Alternatively, a forklift operated by trained and authorized personnel can be
used to pick up the charger
Close the front and rear doors before moving the charger. Failure to do so
could result in damage to the charger
5)
Lift the DC Fast Charger from the palette to the base mount assembly area
Make sure that the bolt holes in the base of the charger are aligned with the
holes on the base mount assembly
Make sure the electric wire and Ethernet cable conduit is aligned with the DC
Fast Charger input wire opening prior to installation. Failure to do so could
damage the wiring or the charger
6)
Align and lower the DC Fast Charger on the base mount assembly and align with the
pre-drilled holes