25
Compressor control —
The DFB receives inputs indicating
Stage 1 Cooling, Stage 2 Cooling and Stage 1 Heating from
the space thermostat or unit control system (RTU Open
controller); it generates commands to start compressors with
or without reversing valve operation to produce Stage 1
Cooling (one compressor runs), Stage 2 Cooling (both
compressors run) or Stage 1 Heating (both compressors run).
C14049
Fig. 29 -- Defrost Control Board Location
Table 5 – 548J Defrost Board I/O and Jumper Configurations
Inputs
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
G Fan
DI, 24Vac
P2---3
CTB---G
Y1 Cool 1
DI, 24Vac
P2---5
CTB---Y1
Y2 Cool 2
DI, 24Vac
P2---4
CTB---Y2
W1 Heat 1
DI, 24Vac
P2---7
CTB---W1
W2 Heat 2
DI, 24Vac
P2---6
CTB---W2
R Power
24Vac
P3---1
CONTL BRD---8
C Common
24Vac
P3---2
CONTL BRD---4
DFT1
DI, 24Vac
DFT---1 to DFT---1
—
DFT 2
DI, 24Vac
DFT---2 to DFT---2
—
Outputs
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
IFO Fan On
DO, 24Vac
P3---9
REHEAT/HP---2
OF OD Fan On
DO, 24Vac
OF
OFR
RVS1
DO, 24Vac
P3---7 to P3---5
—
Energize in COOL
RVS2
DO, 24Vac
P3---6 to P3---4
—
Energize in COOL
COMP 1
DO, 24Vac
P3---10
FPT1 --- REHEAT/HP---6
COMP 2
DO, 24Vac
P3---8
FPT2 --- REHEAT/HP---8
HEAT 2
DO, 24Vac
E---HEAT
TB4---1
COM
24Vac
P3---3
TB4---3
Configuration
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
Select Jumper
24Vac
P1---1
—
2 Compressor
24Vac
P1---3
—
Use for 548J***D
Speed--Up Configuration
Point Name
Type of I/O
Connection Pin Number
Unit Connection
Note
Speed---Up Jumper
—
JMP17
—
Speed---Up Jumper
—
JMP18
—
Jumper for 1---3 seconds: Factory Test — The defrost interval timing is reduced by a factor of 0.1 seconds/minute based on the positions of
DIP switches SW1 and SW2 (i.e. 90 minutes will be reduced to 9 seconds).
Jumper for 5---20 seconds: Forced Defrost — Defrost runs for 30 seconds if DFT2 is open.
Summary of Contents for 548J*17 D Series
Page 4: ...4 a548J 015 Fig 2 Unit Dimensional Drawing Size 17 Units ...
Page 5: ...5 a548J 016 Fig 2 Unit Dimensional Drawing Size 17 Units cont ...
Page 6: ...6 a548J 017 Fig 2 Unit Dimensional Drawing Size 17 Units cont ...
Page 7: ...7 a548J 018 Fig 3 Unit Dimensional Drawing Size 24 Units ...
Page 8: ...8 a548J 019 Fig 3 Unit Dimensional Drawing Size 24 Units cont ...
Page 9: ...9 a548J 020 Fig 3 Unit Dimensional Drawing Size 24 Units cont ...
Page 13: ...13 C10139 Fig 7 Roof Curb Details Size 17 Units ...
Page 14: ...14 C10140 Fig 8 Roof Curb Details Size 24 Units ...
Page 19: ...19 a50 9696 Fig 20 548J 17 24 Control Wiring Diagram with VFD Option ...
Page 20: ...20 a50 9697 Fig 21 Typical 548J 17 24 Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Page 44: ...44 a50 9699 Fig 44 RTU Open System Control Wiring Diagram ...