17
Hood Top
Shipping
Position
C09134
Fig. 13 -- Hood Top – Shipping Position
Hood
Package
C13785
Fig. 14 -- Hood Package – Shipping Location
To remove the hood parts package:
1. Remove the back blower access panel.
2. Locate and cut the strap, being careful to not damage
any wiring.
3. Carefully lift the hood package carton through the
back blower access opening.
See Fig. 15 for identification of the various parts of the
hood assembly.
Apply Seal Strips
to the back of
these flanges
Apply Seal Strip
to the front of
this flange
Apply Seal Strip
to the front of
this flange
Apply Seal Strip
to the back of
this flange
Seal Strips
Apply Seal Strips
to the back of
these surfaces
7
7
2
2
1
3
4
4
4
4
5
6
5
6
Item #
Description
Qty
1
Angles
4
2
Side Plates
2
3
Hood
1
4
Outdoor
Air
Screens 4
5
Side Filter Supports
2
6
Side
Drip
Angles
2
7
Top
Diverters
2
C09079
Fig. 15 -- Hood Part Identification and Seal Strip
Application Areas
To assemble the outside air hood:
1. Remove hood top panel from shipping position on
unit end.
2. Install four angles to the upper end panel using the
screws provided
3. Apply seal strip to mating flanges on the side plates
of the hood (see Fig. 15).
4. Secure side plates to panel using the screws provided.
5. Apply seal strip to mating flange of the hood (see
Fig. 15).
6. Secure top flange using screws provided in kit.
7. Install outdoor air screens by sliding them into the
channel formed by the four angles installed in step 2.
Make sure that the screens extend across the entire
length of the hood.
8. Install side filter supports using the screws provided
9. Install side drip angles using the screws provided.
10. Run a continuous length of seal strip across the hood
covering the engagement holes in the lower hood.
11. Install top diverter using the screws provided.
12. On units with barometric relief, remove screws at bot-
tom of relief damper.
Do not discard damper door
.
C09090
Fig. 16 -- Hood Assembly – Completed
Step 9 — Install External Condensate Trap and
Line
The unit has one
3
/
4
-in. condensate drain connection on
the end of the condensate pan (see Fig. 17) See Fig. 2 (or
Fig. 3), item “E”, in the view labeled “BACK” for the
location of the condensate drain connection.
STANDARD
SIDE DRAIN
C09056
Fig. 17 -- Condensate Drain Pan Connection
The piping for the condensate drain and external trap can
be completed after the unit is in place. Hand tighten
fittings to the drain pan fitting. Provide adequate support
for the drain line. Failure to do so can result in damage to
the drain pan. See Fig. 18.
Summary of Contents for 548J*17 D Series
Page 4: ...4 a548J 015 Fig 2 Unit Dimensional Drawing Size 17 Units ...
Page 5: ...5 a548J 016 Fig 2 Unit Dimensional Drawing Size 17 Units cont ...
Page 6: ...6 a548J 017 Fig 2 Unit Dimensional Drawing Size 17 Units cont ...
Page 7: ...7 a548J 018 Fig 3 Unit Dimensional Drawing Size 24 Units ...
Page 8: ...8 a548J 019 Fig 3 Unit Dimensional Drawing Size 24 Units cont ...
Page 9: ...9 a548J 020 Fig 3 Unit Dimensional Drawing Size 24 Units cont ...
Page 13: ...13 C10139 Fig 7 Roof Curb Details Size 17 Units ...
Page 14: ...14 C10140 Fig 8 Roof Curb Details Size 24 Units ...
Page 19: ...19 a50 9696 Fig 20 548J 17 24 Control Wiring Diagram with VFD Option ...
Page 20: ...20 a50 9697 Fig 21 Typical 548J 17 24 Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Page 44: ...44 a50 9699 Fig 44 RTU Open System Control Wiring Diagram ...