GS-X Pinsetter w/Advanced (CE) Guarding Operation Manual
31
Area 2 - Ball Accelerator Platform
On occasion there may be a pinsetter stop or maintenance that cannot be done from work area 1. The
areas involved may include the top of the elevator or the back to mid position of the distributor. Access
to these locations can be obtained standing on the ladder or the platform on top of the ball accelerator’s
ball box. Refer to the figure titled
Pinsetter Work Area 2 - Ball Accelerator Platform
.
This area may be used for such activities as:
1. Cleaning distributor belts
2. Correcting pin handling issue on the shark assembly or at the back of the distributor.
3. Correcting issues at the back of the pinsetter main frame
Pinsetter Work Area 2 - Ball Accelerator Platform
(1) ACCESS DOORS
(2) WORK AREA 2
(3) BACK OF MACHINE (4) SUPPORT BRACES
(5) SUPPORT SHAFTS