30
GS-X Pinsetter w/Advanced (CE) Guarding Operation Manual
Area 1 - Floor
The most frequent area used for operating and maintaining the pinsetter is the floor area behind the
pinsetters. During operation, all machine activity can be observed from this location. Additionally,
interlocked doors provide access to the ball accelerator, elevator, shark assembly, ball cushion, transport
band and the back portion of the distributor allowing the mechanic to easily correct a machine stop or
perform maintenance. Refer to the figure titled
Pinsetter Work Area 1 - Floor
.
This area may be used for such activities as:
1. Cleaning the transport band
2. Correcting ball return stops
3. Correcting pin elevator jams
Pinsetter Work Area 1 - Floor
(1) ACCESS DOORS
(2) BACK OF MACHINE
(3) WORK AREA 1