©2004,2002 BRUNO INDEPENDENT LIVING AIDS, INC.®
SRE-2700 06-11-2004
18
1) Remove the carriage from the shipping carton.
2) Make sure circuit breaker is OFF.
3) Manually slide the carriage onto the rail until
approximately half of the carriage is on the rail.
4) Manually turn the motor pulley to fully engage the
entire carriage onto the rail.
INSTALLATION
MOUNTING CARRIAGE ON UPPER RAIL
circuit breaker off
sliding carriage on rail