
39
ZTKS0156 / Z31820 / Rev.: 03
Assembling
4.2
Assembling Workflow
Figure 4.1:
Assembling Workflow
Mount the
Magnet Stand
Prepare the
Cryostat
Assemble
Bore Tubes
Check
Drop off plate
Mount the
Cryogenic
Refrigerator
Parts
Rotary Valve Column
Monitoring
Generate
Vacuum
Cooldown the
Cryostat
Assemble vacuum valve
Remove vacuum valve
Precool (80K)
Cooldown (4.2K)
Switch on
Cryogenic Refrigerator
Energize Magnet
Cycle/Shim
Magnet
Remove current
lead
Insert Current
Lead
Remove the
transportation locks
Insert the getter
container
Sub-Procedure different
from Standard NMR
Standard NMR
Procedure
Standard NMR
Sub-Procedure
KEY:
Procedure different from
Standard NMR
Start Monitoring
Pump an Flush
Evacuate
Cold head
He-Turrets and
Flow System
Feedthrough Plate
Compressor
Summary of Contents for RS
Page 1: ...NMR Spectroscopy Service Manual RS ...
Page 4: ...4 ZTKS0156 Z31820 Rev 03 ...
Page 8: ...8 ZTKS0156 Z31820 Rev 03 Table of Contents ...
Page 10: ...10 ZTKS0156 Z31820 Rev 03 Contact ...
Page 14: ...14 ZTKS0156 Z31820 Rev 03 Introduction ...
Page 36: ...36 ZTKS0156 Z31820 Rev 03 Transportation ...
Page 86: ...86 ZTKS0156 Z31820 Rev 03 Operation ...
Page 112: ...112 ZTKS0156 Z31820 Rev 03 Troubleshooting ...
Page 132: ...132 ZTKS0156 Z31820 Rev 03 Disassembling ...
Page 134: ...134 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 136: ...136 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 142: ...142 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 144: ...144 ZTKS0156 Z31820 Rev 03 Appendix ...
Page 150: ...150 ZTKS0156 Z31820 Rev 03 Technical Data RS Service This side is intentionally left blank ...
Page 156: ...156 ZTKS0156 Z31820 Rev 03 ...