Deploy motion sensor
Add a motion sensor
| 83
2. Splice extra cable with the cut
ends:
> Add a length of marine grade
3
conductor cable
, 22-16 AWG.
> Connect the
red [+]
wires,
black [-]
wires, and
white
wires
with heat shrink butt
connectors
3. Wrap the connections with
electrical tape.
②
Prepare motion sensor
cable
Prepare a motion sensor cable for your
BRNKL Rapid Deploy.
To run a motion sensor cable:
• From the motion sensor, run the
cable to the Rapid Deploy.
Lengthen the cable to make longer
cable runs.
To lengthen a motion sensor
cable:
1. Cut the
white
segment of cable.
Summary of Contents for Rapid Deploy
Page 1: ...Setup Guide BRNKL Rapid Deploy RSG1002021 ...
Page 2: ...Get more help at brnkl io help ...
Page 18: ...16 Ready Set up monitoring and alerts 4 Save settings Save ...
Page 35: ...Set and calibrate Deploy 33 4 Save settings Save ...
Page 110: ...108 Legal Legal ...
Page 113: ...Get more help at brnkl io help ...
Page 114: ......