26 |
Deploy
Add solar panel
④
Test solar panel
connection
Make sure the solar panel is ready to
charge your BRNKL Rapid Deploy.
To test the solar panel
connection:
Inside the Rapid Deploy:
1. Find the solar charge controller.
2. On the controller, check the
green
indicator light.
> If the light is
on
or
flashing
, the
panel is connected.
> If the light is
off
, the panel isn’t
connected.
Check the cable connections
and repeat the test.
Summary of Contents for Rapid Deploy
Page 1: ...Setup Guide BRNKL Rapid Deploy RSG1002021 ...
Page 2: ...Get more help at brnkl io help ...
Page 18: ...16 Ready Set up monitoring and alerts 4 Save settings Save ...
Page 35: ...Set and calibrate Deploy 33 4 Save settings Save ...
Page 110: ...108 Legal Legal ...
Page 113: ...Get more help at brnkl io help ...
Page 114: ......