B
RADFORD
W
HITE
Section 1 -
General Information
1.1 Introduction ....................................................... 1
1.2
Model Identification
........................................... 1
1.3
Appliance Overview
.......................................2-7
1.4
Dimensions, Indoor Models .............................. 8
1.5
Dimensions, Outdoor Models
......................... 10
1.6
Warranty
......................................................... 11
1.7
Installation Kit
................................................. 12
Section 2 -
Locating the Appliance
2.1
General Information
........................................ 14
2.2
Locating Appliance for Correct Vent Distance
from Outside Wall or Roof Termination
........... 14
Section 3 -
Venting and Combustion Air
3.1
General Venting
.............................................. 15
3.2
Combustion Air
............................................... 15
3.3
Venting
............................................................ 17
3.4
Locating Vent & Combustion Air Terminals
..... 20
3.5
Common Vent Test
......................................... 23
Section 4 -
Gas Supply and Piping
4.1
Gas Supply and Piping
................................... 24
Section 5 -
Pump Requirements
5.1
BruteBoiler Flow and
Head Requirements
........................................ 25
5.2
BruteWater Heater
Flow and Head Requirements
........................ 25
Section 6A -
Water Connections - BNTH Boiler
6A.1 BNTH System Piping: Hot Supply
Connections
.................................................... 26
6A.2 BNTH Cold Water Make-Up
........................... 26
6A.3 Condensate Drain
........................................... 27
6A.4 Freeze Protection
........................................... 27
6A.5 BNTH Suggested Piping Schematics
........27-33
6A.6 Recognized Chemicals
................................... 27
Section 6B -
Water Connections - BNTV Water Heater
6B.1 BNTV Water Quality
....................................... 34
6B.2 Piping Requirements
...................................... 34
6B.3 Cold Water Make-Up
...................................... 34
6B.4 Condensate Drain
........................................... 35
6B.5 Freeze Protection
........................................... 35
6B.6 BNTV Suggested Piping Schematics
............. 35
6B.7 BNTV Suggested Pumps
................................ 35
Section 7 –
Electrical and Wiring Diagrams
7.1
Installation Warnings
....................................... 37
7.2
Main Power Connections
...........................37-38
7.3A Pump Connections and Operation
.................. 37
7.3B Optional Variable Speed Pump Control
.......... 37
7.4
Hydronic Heating Using External Mod
............ 39
7.5
Optional Field Connections
............................. 39
7.6
Lead Lag Connections
.................................... 40
7.7
Building Automation Systems Connections
.... 41
7.8
System Wiring Diagram
.................................. 42
7.9
Ladder Diagram
.............................................. 43
Table of Contents
i
Summary of Contents for Copper Brute II BWCH 2000
Page 4: ...BRADFORD WHITE...
Page 26: ...Page 22 BRADFORD WHITE 150 285 Figure 23 Minimum Venting Distance...
Page 48: ...Page 44 BRADFORD WHITE Figure 38 Ladder Diagram 7 9 Ladder Diagram...
Page 96: ...Page 92 BRADFORD WHITE Parts Illustration 4 Internal Components Sizes 750 850...
Page 98: ...Page 94 BRADFORD WHITE Parts Illustration 6 Gas Train Components Sizes 600 850...
Page 102: ...Page 98 BRADFORD WHITE Notes...
Page 103: ...Page 99 Brute HIGH EFFICIENCY COMMERCIAL BOILERS AND VOLUME WATER HEATERS Notes...