Page 62
B
RADFORD
W
HITE
Note: In the Lead Lag Follower Sub-Menu, Identify
each control
(including the Lead Lag Master)
as a
Follower by turning on ‘Follower Enable.
From the Status Summary Screen, press the
‘Configure’ button.
Scroll down and press ‘Lead Lag Follower
Configuration’
Press ‘Disabled’’
Choose ‘Enable Follower for built-in Lead Lag
Master’
Then press ‘OK’.
The lead boiler (Master control) is now configured.
8.7.18 Lead Lag Leader Config (continued)
Summary of Contents for Copper Brute II BWCH 2000
Page 4: ...BRADFORD WHITE...
Page 26: ...Page 22 BRADFORD WHITE 150 285 Figure 23 Minimum Venting Distance...
Page 48: ...Page 44 BRADFORD WHITE Figure 38 Ladder Diagram 7 9 Ladder Diagram...
Page 96: ...Page 92 BRADFORD WHITE Parts Illustration 4 Internal Components Sizes 750 850...
Page 98: ...Page 94 BRADFORD WHITE Parts Illustration 6 Gas Train Components Sizes 600 850...
Page 102: ...Page 98 BRADFORD WHITE Notes...
Page 103: ...Page 99 Brute HIGH EFFICIENCY COMMERCIAL BOILERS AND VOLUME WATER HEATERS Notes...