Operator’
s Manual
SMASH 24GT
32
Operations
(2
5.1.1 Removing the tires
BEFORE PROCEEDING WITH THE TYRE
EXTRACTION, CHECK THAT BOTH BEADS ARE
COMPLETELY BROKEN.
3
5.1-4
5.1-5
5.1-6
5.1-7
5.1.1.1 Head Positioning
Procedure:
DURING THE CLOSURE OF THE HEAD, MAKE SURE
THAT ITS POSITION DOES NOT KNOCK INTO THE
WHEEL.
•
Activate the pedal control (
3 Figure
5.1.2.1-2
) to bring the Arm into the working
position on the wheel.
•
Bring the tool into contact with the edge of the rim
and lock it in place.
The tool automatically moves away from the rim in a
vertical and radial sense by about 2 mm; this is
necessary to prevent damage to the rim.
Note
: once the mount/demount head is
positioned properly
, with the control (
4
Figure 5.1.2.1-1
),
matching wheels may
be changed without having to reset the
head.
Note
: The plastic inserts inside the mounting/
demounting head must be replaced
regularly. Each machine is supplied with
various spare inserts (in the accessories
box).
5.1.1.2 Upper bead extraction
•
Insert the bead lifting tool under the bead and over
the support of the mount/demount tool. Lift the bead
onto the mounting finger. To facilitate this operation,
press with left hand on the bead in position
diametrically opposite to that of the tool. If desired,
the bead lifting tool can be removed after lifting the
bead onto the finger (Fig. 5.1-5).
•
Rotate the turntable clockwise and at the same time
push down on the tire sidewall to move the bead
into the drop-center of the rim (Fig.5.1-6).
5.1.1.3 Lower bead extraction
•
Repeat the process for removing the lower bead.
With left hand, lift the bead in position diametrically
opposite the tool to keep it in the drop center (Fig.
5.1-7).
•
When the tyre has been demounted, depress the
pedal to tilt the tower backwards.
http://www.atlas-tools.ru
АТЛАС
-
ОБОРУДОВАНИЕ
для
АВТОСЕРВИСА
+7 (863) 226-92-88