94
A second person is recommended to stabilize the Frame
Assembly
.
15. Using an 8mm hex wrench, remove the indicated hardware from the
old Frame Assembly. Be prepared to support the Frame Assembly before
removing the hardware.
The Frame Assembly may be awkward when released from the
Stabilizer Assembly. Some components of the machine can be
heavy or awkward. Use a second person to hold the Frame
Assembly stable and upright. Do not do steps that involve
heavy lifting or awkward movements on your own.
16. With the assistance of a second person, carefully lift the old Frame As-
sembly from the Stabilizer Assembly and place outside the assembly area.
To protect your flooring, carefully place it onto its side on some cardboard
or a blanket.
17. Using a 13mm wrench, remove the hardware that secures the new Frame
Assembly to the shipping plate.
18. Carefully Lift the new Frame Assembly and Attach It to the Stabilizer As-
sembly
Some components of the machine can be heavy
or awkward. Use a second person when doing
the assembly steps involving these parts. Do
not do steps that involve heavy lifting or
awkward movements on your own. Lift the
Frame Assembly from the exterior of the pivot
assembly as indicated below.
19. Fully tighten the hardware that attaches the Rail As-
sembly to the new Frame Assembly (from Step 13), and
then the hardware just installed to the Stabilizer Assembly.
13mm
X2
C
11
X4
N
D
1
D
E
X4