
102
/104
A4... with HS5E(V)(L) control system Series 1x and 30
| Alphabetical index
Bosch Rexroth AG, RE 92076-01-B/2021-04-22
16 Alphabetical index
A
Abbreviations.................................. 9
Above-reservoir installation .......... 44
Ambient conditions ...................... 31
Ambient temperature .................... 31
B
Basic operating modes ................. 24
Below-reservoir installation .......... 44
C
Calibration ................................... 80
Care ............................................. 85
Charge pump ................................ 22
Checking swivel angle measurement
100
Circuit
closed ........................................ 22
Cleaning ....................................... 85
Commissioning ............................. 63
Initial ......................................... 65
Connecting electrically ................. 57
Connection
electric ................................. 56, 57
hydraulic .................................... 50
Controller parameter
setting ........................................ 76
Conversion ................................... 91
Corrosion protection .................... 40
Corrosion protection film ............. 40
D
Designations ................................... 9
Dimensions....................... 38, 46, 48
Direction of rotation ..................... 46
Disposal ....................................... 91
Drive shaft .................................... 22
E
Eye bolt ........................................ 38
F
Fault diagnosis ............................. 93
Filling ........................................... 65
Flushing cycle ............................... 57
Functional test ............................. 67
H
HFC fluids..................................... 31
High-pressure side ........................ 22
HS5E control system .................... 22
HS5E pilot control valve ............... 88
Hydraulic fluid
Selection .................................... 31
I
Identification ................................ 37
IndraWorks
Description ................................ 35
IndraWorks commissioning tool .... 35
Inspection .................................... 86
Installation ................................... 42
Completion ................................ 48
General instructions .................. 46
On a gearbox .............................. 48
On gearbox ................................ 48
Preparation ................................ 45
With cardan shaft ....................... 48
With coupling ............................. 47
Installation conditions .................. 42
Installation position
Above-reservoir installation........ 44
Below-reservoir installation ....... 44
Intended use ................................ 10
L
Layout .......................................... 22
Lifting devices .............................. 38
Lifting strap .................................. 39
M
Maintenance ........................... 85, 86
Malfunction table ......................... 94
Master/slave operation ................. 32
switching off .............................. 34
switching over ............................ 34
Maximum working pressure .......... 29
N
Name plate ................................... 37
Noise development ....................... 31
Notes
General ...................................... 46