13/27
Bosch Rexroth Canada I March 2021 ı Revision 3.0
STEP 1:
Ensure system safe to run
Make sure the Conveyor
and Gate cylinder has
been correctly set up and
calibrated
Start to proceed
STEP 2:
Continue if you have
a container ready and
sufficient material
always above the gate
opening throughout
the calibration process
Continue to next step
Stop to abort
STEP 3:
Controller
automatically move
the gate to position 1
Continue to next step
Stop to abort
STEP 4:
Recommend to discharge
minimum 100kg or 220lbs
material (more for better
resolution)
Enter weight of the
material collected
Continue to next step
Stop to abort
Summary of Contents for Rexroth CS660
Page 1: ...CS660 CS661 Spreader Controller Calibration Manual ...
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......