12/27
Bosch Rexroth Canada I March 2021 ı Revision 3.0
STEP 2
Dial to 2
nd
or 3
rd
position for
decent conveyor speed
Continue to next step
Stop to abort
Complete!
When the material
calibration ends the
Wt/Rev at the calibrated
gate position is
refreshed.
STEP 3:
Recommend to discharge
minimum 100kg or 220lbs
material (more for better
resolution)
Enter weight of the
material collected
Continue to next step
Stop to abort
2.5.3
Solid Material Calibration
–
Auto Gate
1.
Prepare a container to catch material discharged
2.
Make sure that sufficient material in the hopper and the system is safe to run.
3.
Press ‘START’ to proceed and follow the instruction on the screen
**
Auto Gate operation has two calibration points, Wt/Rev at Gate position 1 and 3. Simply follow steps
on screen to go through the calibration process.
Summary of Contents for Rexroth CS660
Page 1: ...CS660 CS661 Spreader Controller Calibration Manual ...
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......