1 689 978 508
2011-12-03
|
Robert Bosch GmbH
Operator Instructions | CAM 847 | 21
en
2. Operator Instructions
2.1
Important information
Installation and/or repairs may only be carried out by
trained and instructed Service personnel from Robert
Bosch GmbH or by organizations appointed to do such
work by Robert Bosch GmbH. If the devices are opened
or modified by unauthorized personnel, then all warran-
ty claims will be rendered null and void.
Electrical systems and equipment may only be put into
operation when in proper operating condition (see
Inspection and testing information 0108_084). This
requirement is deemed to have been fulfilled if, after
modification or repairs (initial test), it has been ascer-
tained that the requirements set out in the electrical
engineering regulations have been adhered to. To this
end, tests are to be performed that comply with the
methods and scope set out in the measures specified in
the applicable electrical engineering regulations
(e.g. BGV A3 in Germany). The type and scope of tests
are specified in VDE 0701/0702 Section 1 within Ger-
many. Corresponding national specifications are to be
adhered to in other countries.
Important notes on the agreement pertaining to copy-
right, liability and warranty, about the user group and
obligation on the part of the contractor, are available in
the separate instructions entitled “Important notes and
safety instructions on Bosch Diesel test equipment”.
These are to be read thoroughly and strictly adhered to
before using, connecting and operating the product.
2.2
Safety instructions
All safety instructions are available in the separate in-
structions “Important notes and safety instructions on
Bosch Diesel test equipment”. These are to be read tho-
roughly and strictly adhered to before using, connecting
and operating the product.
2.3
General information
These instructions describe initial start-up of the
CAM 847 tester set.
These instructions are a supplement to the existing
instructions for the EPS 815 and the KMA 802/822 elec-
tronic flow metering system. These instructions are only
valid in conjunction with the existing instructions and
they must be kept and passed on together.
2.4
Requirements
R
EPS 815
1)
with 2 kVA network transformer (T3) and
lubricating oil supply
R
KMA 802 or KMA 822 flow metering system with
dip tubes
R
PC with Windows 2000/Windows 7 and COM 4 serial
port
R
Heat exchanger 1 687 010 130 or 1 687 010 336.
R
Incremental phase-angle sensor 1 687 224 963
R
Voltage stabilizer 1 687 022 873
1)
For operation of the CAM 847 tester set, the EPS 815 must be
set up such that the EPS drive is on the user's left side.
A trigger electronics unit is required to operate the
CAM 847 tester set. If you have the CRI 846/CRI 846H
tester set, you can use the supplied trigger electro-
nics. If not, you must order the trigger electronics
1 687 023 369 (Special accessory) as well.
2.5
Required tools
R
General tools for electricians and mechanics
Summary of Contents for CAM 847
Page 2: ......