22
Operating Instructions AEC
11/17
4.5
Unpacking the device
Carefully remove packaging.
Check if the delivered devices corresponds to the order.
Check the device for transport damage and completeness.
Any defects/damage must be reported to the supplier immediately.
Ensure that all packaging materials are disposed of in an environmentally compatible
manner.
4.6
Bringing the device into installation position
4.6.1
Sizes 3 through 6
Depending on the weight, one or two persons are required for lifting the device into the installation
position in the electrical cabinet. Installation, see Chapter „Mechanical installation".
4.6.2
Sizes 7 and 8
Fix two transport eyes (M8) in the marked threaded holes on the top side of the device.
Use appropriate lifting means.
NOTE
The pull angle must not be smaller than 60°.
Summary of Contents for AEC 401 Series
Page 1: ...Device Series Active Energy Control AEC 401 Operating Instructions ...
Page 2: ......
Page 88: ......
Page 89: ......