Product Assembly
STEP
25
13
NOTE: DO NOT tighten bolts until Step # 17
b.
Place
Pulley P3 (36)
under Cable (27) towards Right
Top Frame. Insert Bolt (50) through frame and Pulley
P3 securing them with Washer (62) and Nut (69)
Make sure the cable is under the cable retainer
welded-in
Metal Bars.
a.
Take out
Bolt (50)
from the front top hole of the Right Top Frame (6R). Then route Cable (27)
under the metal bar towards Pulley P4 area and drop cable down towards the weight stack.
c.
Pull
Cable (27)
up in
middle of Right Top
Frame (6R) and place
Pulley P4 (36) under
Cable (27). Lower
down Cable & Pulley
P4 (36). Insert Bolt (51)
and secure through
frame with Washer (62)
and Nut (69).
Hardware used for Step #13
Item # Description
Qty Pic
50
3/8" X 4-1/4" BLACK HEX BOLT
NOTE
: 1/4” longer than (51)
2
51
3/8"X 4" BLACK HEX BOLT
NOTE
: 1/4” shorter than (50)
2
62
3/8" BLACK WASHER
8
69
3/8" BLACK NYLON NUT
4
P3, P4
d.
Perform the same procedure
from
a, b, & c
to opposite
side.
Summary of Contents for HFT PRO
Page 2: ...1...
Page 40: ...39 PARTS EXPLODED VIEW...
Page 42: ...41 HFT PRO DETAILED PARTS LIST 2 OF 2 Part images are not to scale...
Page 44: ...43 PRODUCT WARRANTY REGISTRATION...
Page 45: ...44...