background image

INSTALLATION 

READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION

 

Unpack the unit.  Inspect all components for completeness and 
condition.  Ensure that all packing materials have been removed 
from the unit.  

 

Verify that the Spray Head Gasket and Spray Disk are properly 
installed.   

 

 

LEVELING THE UNIT 

 

Verify that an adjustable leg is installed at each corner of the 
brewer. 

 

Set Brewer in its operating location.  Level the Brewer.  A spirit 
level should be placed on the top of the unit, at the edge, as a 
guide when making level adjustments. 

 

Level the unit from left to right and front to back by turning the  
adjustable feet.  Be sure all four feet touch the counter to prevent 
tipping. 
 

PLUMBER’S INSTALLATION INSTRUCTIONS  

 
Brewer should be connected to a 

POTABLE WATER, COLD 

WATER

 line.  Flush water line before connecting to Brewer.  

 

 

DO NOT use a saddle valve with a self-piercing tap for the water 
line connection.  Such a tap can become restricted by waterline 
debris.  For systems that must use a saddle tap,  shut off the main 
water supply and drill a 3/16” (minimum) tap for the saddle     
connection, in order to insure an ample water supply.  Remember 
to flush the line prior to installing the saddle. 

 

The brewer must be installed on a water line with average     
pressure between 20 PSI and 90 PSI.  If your water pressure   
exceeds 90 PSI at anytime, a pressure regulator must be 
installed in the water supply  line to limit the pressure to not more 
than 90 PSI in order to avoid damage to lines and solenoid. 

 

A water shut-off valve should be installed on the incoming water 
line in a convenient location (Use a low restriction type valve, 
such as a 1/4-turn ball valve, to avoid loss of water flow thru the 
valve. 

IMPORTANT: 

To enable the installer to make 
a quality installation and to  
minimize installation time, the 
following suggestions and tests 
should be done before the     
actual unit installation is started: 

 

 
CAUTION:

  

Equipment 

Electrical Damage 

 

DO NOT plug in or energize this 
appliance until all Installation 
Instructions are read and       
followed.  Damage to the 
Brewer will occur if these 
instructions are not followed. 
 

 

CAUTION: Unstable 
Equipment Hazard 
 

It is very important for safety 
and for proper operation that the 
brewer is level and stable when 
standing in its final operating 
position.  Provided adjustable, 
non-skid legs must be installed 
at each corner of the unit.    
Failure to do so will result in 
movement of the brewer which 
can cause personal Injury and/
or damage to brewer. 
 
 

NOTE:

  Water supply inlet line 

must meet certain minimum 
criteria to insure successful 
operation of the brewer. 
Bloomfield recommends 1/4" 
copper tubing for installation of 
less than 12 feet and 3/8" for 
more than 12 feet from a 1/2" 
water supply line.  

 

 

 
 

Summary of Contents for 8783UK

Page 1: ...110702 cps 914 OWNERS MANUAL for AIRPOT COFFEE BREWERS WITH INDEPENDENT HOT WATER DRAW FAUCET MODEL 8783UK Includes Installation Operation Use Care Servicing Instructions Model 8783UK Brewer with opti...

Page 2: ...coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHAN...

Page 3: ...ins the information needed to properly install this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECI...

Page 4: ...FEATURES AND OPERATING CONTROLS 2 Fig 1 Features Operating Controls...

Page 5: ...ents This appliance is intended for use in commercial establishments where all operators are familiar with the appliance use limitations and associated hazards Operating instructions and warnings must...

Page 6: ...een 20 PSI and 90 PSI If your water pressure exceeds 90 PSI at anytime a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid d...

Page 7: ...TANT This brewer requires a dedicated 20 amp single phase 220 to 240 volt AC circuit Contact a licensed electrician to install the proper circuit NSF requires that the brewer be able to be moved for c...

Page 8: ...amber Be sure heater switches are OFF 2 Turn main power switch ON 3 Press BREW button and allow brew cycle to complete Repeat until water flows from the brew head 4 Place an empty container under the...

Page 9: ...button energizes the solenoid valve allowing water from an external water supply to flow into the basin pan and then into the hot water tank This forces an identical amount of hot water out of the tan...

Page 10: ...mber to level the bed of grounds Slide the brew chamber into place under the brew head B AUTOMATIC OPERATION BE sure READY COFFEE SYSTEM light is lit Place the appropriate EMPTY airpot or decanter in...

Page 11: ...disk with clean water and allow to air dry 7 Wash the brew chamber in a sink using warm water and a mild detergent Rinse with clean water and allow to air dry 8 Wipe the exterior of the brewer with a...

Page 12: ...imit safety switch tripped Damaged internal component or wiring Timer out of adjustment Too many filter papers or wrong filter paper Brew chamber dispense hole plugged Too much coffee or too fine a gr...

Page 13: ...NT PANEL Remove front panel to access to terminal block brew timer and faucet water level controller Front panel is held by two retaining clips under main warmer cover plate and a retaining lip at the...

Page 14: ...ture adjustments may be made by removing the appropriate button plug from the side of the brewer then turning the thermostat adjustment shaft Check water temperature at the brew head for coffee or at...

Page 15: ...ter delivered Replace button plug REMOVE TANK LID ASSEMBLY Disconnect brewer from electric power Turn OFF water supply Remove top panel Disconnect fill and outlet tubes from tank lid fittings Disconne...

Page 16: ...r inlet fitting 2 Remove the tank lid assembly as described on page 13 3 Remove the coffee water tank from the brewer body by lifting straight up Empty all water from the tank Set the tank back into t...

Page 17: ...Drain all water from the tank Using a stiff bristle brush scrub the interior of the water tank to remove lime and calcium build up Rinse with clean water drain then replace drain cap 7 Reassemble the...

Page 18: ...EXPLODED VIEW PARTS LIST 16 8783UK...

Page 19: ...EXPLODED VIEW PARTS LIST continued 17...

Page 20: ...SERVICE KITS 18 SERVICE KITS SOLENOID REPAIR KITS 86107 SOLENOID COMPLETE DUAL 0 75GPM 240V 85218 KIT INLET CAP INLET FITTING WASHER and SCREEN 85219 SCREEN ONLY...

Page 21: ...WIRING DIAGRAM 19...

Page 22: ...Bloomfield Industries Inc Division of Carrier Commercial Refrigeration In US and Canada Telephone 775 698 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only...

Reviews: