background image

SERVICING INSTRUCTIONS (continued) 

TEMPERATURE ADJUSTMENT 

 

Unplug power cord or turn circuit breaker OFF.  Remove top 
panel. 

 

Pull vent tube out of tank lid and insert a thermometer of known       
accuracy in hole.  Reconnect brewer to electrical power.   
Place empty container under brew chamber.  Energize brewer 
and allow unit to heat.   When READY indicator lights, read the  
temperature displayed on thermometer.  

 

Adjust WATER TEMP shaft on thermostat;  clockwise increases  
temperature.  Refer to Table 1 below for proper brewing              
temperature based on altitude. 

 
 
 

 
 
 

Fig. 10  Checking and Adjusting Brew Temperature 

CAUTION 
Electric Shock 
Hazard 
 

These procedures involve       
exposed electrical circuits. 
These procedures are to be  
performed by qualified         
technical personnel only. 

 

Adjustments to be performed by 
qualified technician only. 

 

NOTE: 

Optimum coffee brewing     

temperature is 195ºF to 205ºF 
(90ºC to 96ºC). 
Thermostat should be adjusted 
to a maximum temperature of 
203ºF (95ºC).  
 
NOTE:  Water temperature              
adjustments may be made by 
removing the appropriate button 
plug from the side of the brewer, 
then turning the thermostat    
adjustment shaft.  Check water 
temperature at the brew head 
for coffee, or at the faucet for 
hot water.  Because of losses in 
the connecting piping, the      
procedure at left provides a 
more accurate gauge of the   
actual tank temperature. 

 

IMPORTANT: 

A mechanical thermostat will 
maintain temperature within 
±10ºF (±6ºC). 
To prevent boiling water in the 
brewer, controller should be   
adjusted to a maximum        
temperature of 10ºF(6ºC) less 
than the local boiling             
temperature, or 202ºF (94ºc), 
whichever is less.  

 

NOTE: 
1/8 turn  = approx 10ºF (5.5ºC) 

Table 1    Boiling Temperature by Altitude 

12 

ELEVATION (feet above seal level)

0

50

0

1,0

00

1,

50

0

2,

00

0

2,50

0

3,00

0

3,50

0

4,00

0

4,5

00

5,

00

0

5,5

00

6,0

00

6,

50

0

TEM

P.

 (ºF

)

195

200

205

210

190

IDEAL
BREWING
TEMPERATURE

MAXIMUM 
TEMPERATURE

SETTING

BOILING

POINT OF
WATER

ELEVATION (meters above seal level)

0

15

0

300 450 600 75

0

90

0

1.0

50

1.2

00

1.35

0

1.5

00

1.6

50

1.

80

0

1.

95

0

TEM

P.

 (ºC

)

91

94

97

100

88

IDEAL
BREWING

TEMPERATURE
RANGE

MAXIMUM 
TEMPERATURE

SETTING

BOILING

POINT OF
WATER

Summary of Contents for 8783UK

Page 1: ...110702 cps 914 OWNERS MANUAL for AIRPOT COFFEE BREWERS WITH INDEPENDENT HOT WATER DRAW FAUCET MODEL 8783UK Includes Installation Operation Use Care Servicing Instructions Model 8783UK Brewer with opti...

Page 2: ...coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHAN...

Page 3: ...ins the information needed to properly install this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECI...

Page 4: ...FEATURES AND OPERATING CONTROLS 2 Fig 1 Features Operating Controls...

Page 5: ...ents This appliance is intended for use in commercial establishments where all operators are familiar with the appliance use limitations and associated hazards Operating instructions and warnings must...

Page 6: ...een 20 PSI and 90 PSI If your water pressure exceeds 90 PSI at anytime a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid d...

Page 7: ...TANT This brewer requires a dedicated 20 amp single phase 220 to 240 volt AC circuit Contact a licensed electrician to install the proper circuit NSF requires that the brewer be able to be moved for c...

Page 8: ...amber Be sure heater switches are OFF 2 Turn main power switch ON 3 Press BREW button and allow brew cycle to complete Repeat until water flows from the brew head 4 Place an empty container under the...

Page 9: ...button energizes the solenoid valve allowing water from an external water supply to flow into the basin pan and then into the hot water tank This forces an identical amount of hot water out of the tan...

Page 10: ...mber to level the bed of grounds Slide the brew chamber into place under the brew head B AUTOMATIC OPERATION BE sure READY COFFEE SYSTEM light is lit Place the appropriate EMPTY airpot or decanter in...

Page 11: ...disk with clean water and allow to air dry 7 Wash the brew chamber in a sink using warm water and a mild detergent Rinse with clean water and allow to air dry 8 Wipe the exterior of the brewer with a...

Page 12: ...imit safety switch tripped Damaged internal component or wiring Timer out of adjustment Too many filter papers or wrong filter paper Brew chamber dispense hole plugged Too much coffee or too fine a gr...

Page 13: ...NT PANEL Remove front panel to access to terminal block brew timer and faucet water level controller Front panel is held by two retaining clips under main warmer cover plate and a retaining lip at the...

Page 14: ...ture adjustments may be made by removing the appropriate button plug from the side of the brewer then turning the thermostat adjustment shaft Check water temperature at the brew head for coffee or at...

Page 15: ...ter delivered Replace button plug REMOVE TANK LID ASSEMBLY Disconnect brewer from electric power Turn OFF water supply Remove top panel Disconnect fill and outlet tubes from tank lid fittings Disconne...

Page 16: ...r inlet fitting 2 Remove the tank lid assembly as described on page 13 3 Remove the coffee water tank from the brewer body by lifting straight up Empty all water from the tank Set the tank back into t...

Page 17: ...Drain all water from the tank Using a stiff bristle brush scrub the interior of the water tank to remove lime and calcium build up Rinse with clean water drain then replace drain cap 7 Reassemble the...

Page 18: ...EXPLODED VIEW PARTS LIST 16 8783UK...

Page 19: ...EXPLODED VIEW PARTS LIST continued 17...

Page 20: ...SERVICE KITS 18 SERVICE KITS SOLENOID REPAIR KITS 86107 SOLENOID COMPLETE DUAL 0 75GPM 240V 85218 KIT INLET CAP INLET FITTING WASHER and SCREEN 85219 SCREEN ONLY...

Page 21: ...WIRING DIAGRAM 19...

Page 22: ...Bloomfield Industries Inc Division of Carrier Commercial Refrigeration In US and Canada Telephone 775 698 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only...

Reviews: