Operating instructions iS10 / iS20
Installation
38019417000 en
17
4
4
Installation
4.1
Transport and storage
Always transport and store the device in its original packaging. If the device was stored in
an area with low temperatures before being unpacked, the device could condensate in a
room with normal temperatures after being unpacked.
Switch on device only after it has reached room temperature and no longer condensates.
In order to accelerate this process, remove load platter, if necessary.
4.2
Check the electric connection
Installation of power supply provided by customer
The installation of the power supply for connecting to our equipment must be carried out in
accordance with the international specifications and the regulations derived from them.
These essentially include the recommendations of at least one of the following commis-
sions:
–
International Electro-technical Commission (IEC)
–
European Committee for Electro-technical Standardization (CENELEC)
–
German Association for Electrical, Electronic and Information Technologies (VDE)
In case of a strongly contaminated network interference suppressing measures need to be
taken, e. g:
–
Provide separate power line to our devices.
–
Include a capacitive decoupled isolation transformer or some other interference sup-
pressing device into the feeding lines to our devices.
The provided network cable must be suitable for the local supply volt-
age.
–
It must show no external damage.
–
It must not get in contact with liquids.
–
It must comply with the requirements of the Safety Extra Low Volt-
age as per EC Directive.
Removable power cables must not be damaged on both ends of the
plug-in connections.
–
Both ends of the plug-in connections must be connected according
to the coding.
–
The connections must be firmly screwed to each other.