INSTALLATION, OPERATION AND MAINTENANCE MANUAL
BiSolid Saver OM-BSSV00/08/2012/EN
41
Figure 17. Cover panels installation on the boiler
1
3
2
6
4
5
a) Install cover panel for the hoper to fuel feeding door –position 1 fig.17 and screw them on
both sides with four bolts, by using the preliminary drilled orifices.
b) Installation of the heat-exchanger cover – position 2 fig.17 has to be performed in the same
way as described in paragraph (a).
c) The middle cover panel – position 3 fig.17. has to be inserted from its flat side under the
flange and then pulled towards the boiler ends (see fixing part of middle cover, fig.18).
d) Front cover panel – position 4 fig.17 has to be installed from its wider fixing side under the
low body brackets, then fix it with force to the boiler and then fix it to the upper brackets.
e) Installation of side cover panels – positions 4, 5 on fig.17 can be performed similar to
paragraph (d). When fixing the panels to the upper brackets try to precise, so their upper
side goes into the middle cover panel groove – position 3 on fig.17, and after that fix them
(please see the middle cover panel fixing part, fig.18).
Warning:
Before doing the final installation of the cover panels, it is recommended to lift
up each panel lower brackets, by using a bigger screwdriver. The brackets
should be corrected so there is a 2-3 mm gap between their lower edge and the
boiler body. This makes the cover panels installation easier.