INSTALLATION, OPERATION AND MAINTENANCE MANUAL
BiSolid Saver OM-BSSV00/08/2012/EN
20
box (ash tray) must be emptied before it has been filled up. All activities with the ash box
should be performed by using a handle, situated in its front part. After removing the box from
the boiler the ash should be dumped in preliminary prepared fireproof container. When
handling or operating please use gloves as protective equipment.
Danger
When installing the boiler and elements for safety and control please do not
forget that all installation works must comply with the safety labor principles. If
two way safety valve or heat output temperature-regulator replacement is
necessary, please use the recommended devices. In case of using any other
type of devices you should ask the manufacturer company first. The heat output
temperature regulator must be checked by authorized specialist once per year.