2. INTRODUCTION
2.1. BOILER GENERAL REQUIREMENTS
The boiler and its accompanying equipment must be installed and used in accordance to the
designed heating installation, all applicable legal norms, technical standards and manufacturer
instructions. The boiler should be used only for the subscribed purposes.
The boiler must be installed only for the purposes for which is designed. If the boiler is
delivered and installed to the customer by the same person, then the whole accompanying
documentation must be provided as well (especially the user manual book). The boiler’s
genuine package should be kept until its initial operation start up, in case the boiler should be
transported again.
After installation the boiler operation must be initiated by service organization, authorized by
the manufacturer.
The boiler corresponds to the applicable EU legal provisions. If the boiler should be used in
countries outside the EU, all deviations from local laws and legal provisions must be identified
and corrected.
In case of faults in the boiler please contact a service organization authorized by the
manufacturer. Every incompetent intervention might damage the boiler (and possibly the
accompanying equipment).
The service technician initializing the boiler start up for first time must show the customer all of
its main components, different boiler systems and how to control the boiler. The technician
must present the boiler’s safety elements and signalization, and respectively the relevant user
reaction. If the boiler is delivered and installed to the customer by the same person, then he
must ensure that boiler’s genuine package is kept, in case the boiler should be transported
again.
Please check the delivery of the boiler’s standard accompanying equipment.
Please check if the delivered model and type of the boiler corresponds to the usage
requirements.
If you are not sure how to manage the boiler, please carefully read the relevant instructions in
this manual for operation and installation, and respectively continue as prescribed.
Please never take/stick off or damage the marks and signs on the boiler. Please keep the
boiler genuine package until its initialization to operation, in case the boiler should be
transported again.
If doing a boiler repair, you must always use genuine spare parts only!
It is forbidden to make any changes to the internal installation of the boiler or to change
anything in any way.
At the end of the boiler’s life cycle, it should be packed together with its parts and disposed in