Mounting Structure: Bar Joists (cont.)
3. Secure angle irons (span longer than 8 ft)
If the angle iron span is longer than 8 ft (2.4 m), it is necessary to use double angle irons.
Locate the center of the angle iron length. Drill Ø9/16” (1.4 cm) hole through the center of the vertical wall of the angle iron. Drill a total
of four angle irons.
Place two drilled angle irons back to back. Fasten the angle irons together with customer-supplied Ø1/2-13 stainless steel hardware
and tighten the bolts to
40 ft·lb (54.2 N·m)
using a torque wrench and 3/4” socket.
Repeat this step for the remaining two angle irons.
Proceed to step 4b.
Angle Iron Hardware (Customer-Supplied):
a. (2) 1/2-13 Bolt
b. (4) 1/2” Washer
c. (2) 1/2” Nut
a
b
b
c
2. Pre-drill angle irons
Drill two Ø9/16” (1.4 cm) holes exactly 5-3/8” (13.7 cm) apart in the centers of two angle irons.
Measure the distance between the mounting points of the roof structure that the angle irons will span. Measure the same distance on
the angle irons and drill Ø9/16” (1.4 cm) holes through each end of the angle irons. Drill holes in two angle irons if the span is 8 ft (2.4
m) or less. Drill holes in 4 angle irons if span is greater than 8 ft (2.4 m).
Mount with extension tube: 5-3/8’’ (13.7 cm)
Direct mount: 5-1/2’’ (14 cm)
Distance between roof structure mounting points
A
1/2 A
Ø 9/16’’ (1.4 cm)
Side view
Before drilling the angle irons, confirm that you have the appropriate mount to accommodate the roof pitch of your
mounting structure.
If the angle iron span is 8 ft (2.4 m) or less, skip step 3 and proceed to step 4a.
Summary of Contents for powerfoil x2.0
Page 6: ......
Page 48: ......
Page 56: ...Notes...
Page 58: ......
Page 66: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...002972 002972 2425 Merchant St Lexington KY 40511 1 877 BIG FANS WWW BIGASSFANS COM REV J...