Chapter 3. System Description
MicroPolar 2 (++) LB 567
33
3.8
Assembly on a Pipeline
The evaluation unit is installed close to the flow cell to keep the
HF cable between evaluation unit and probe as short as possible.
The shorter the cable connection, the better the stability of the
measurement. The standard length is 2 m and the maximum
length of the HF cable is 10 m.
The flow cell is integrated into the existing pipeline system or in
a bypass. The orientation of the flow cell can either be vertical or
horizontal. To avoid possible sedimentary deposits, vertical in-
stallation in a riser is preferred (see Figure 3-18).
The installation should preferably be close to a sample sampling
point to ensure representative sampling for calibration.
A representative temperature signal (current signal or PT100)
should be connected to the evaluation unit for product tempera-
ture compensation.
Figure 3-18:
Typical measurement
arrangement on
a pipeline
Pipeline inline
or in bypass
Product flow
Sampling
Reference line
with N-connector
HF-cable quad
Evaluation unit
Distance:
typical 2 m
Orientation:
HF-connections
facing down
Micro-Polar
Summary of Contents for LB 567
Page 2: ......
Page 3: ......
Page 36: ......
Page 60: ......
Page 72: ...Chapter 7 Certificates 72 MicroPolar 2 LB 567 7 2 Frequency License...
Page 74: ...Chapter 8 Technical Drawings 74 MicroPolar 2 LB 567 8 2 Electrical Wiring Diagram...
Page 88: ...Chapter 8 Technical Drawings 88 MicroPolar 2 LB 567...
Page 89: ...Chapter 8 Technical Drawings MicroPolar 2 LB 567 89 8 4 2 Spiral antenna...
Page 94: ...Notes 94 MicroPolar 2 LB 567 Notes...
Page 95: ...Notes MicroPolar 2 LB 567 95 Notes...
Page 96: ......
Page 98: ......
Page 102: ......
Page 104: ......
Page 106: ......
Page 108: ......
Page 136: ......
Page 142: ......
Page 156: ......
Page 172: ......
Page 176: ......
Page 185: ...Notes MicroPolar 2 LB 567 89 Notes...
Page 186: ...Notes 90 MicroPolar 2 LB 567 Notes...