10AP Series Two-Post Lifts
41
P/N 5900265 — Rev. A6 — December 2022
Reference only – do not scale.
Perform Steps 3 through 9 for the other Equalizing Cable.
Mounting the Power Unit
This section describes how to mount the Power Unit to the Powerside Post. You do
not
need an
Electrician to
mount
the Power Unit, but you do need an Electrician to
connect
the Power Unit.
Refer to
for installation information for your Electrician and specific
information about the Power Unit that came with your Lift.
NOTICE
Do not connect the Power Unit to the Hydraulic System or to the power source at
this point in the installation; those connections will be made later.
⚠
CAUTION
The Power Unit is heavy. BendPak recommends having one person hold the Power
Unit while a second person bolts it into place.
To mount the Power Unit
:
Find the supplied four Hex Head Bolts, four Nyloc Nuts, and one Vibration Dampener.
Remove the Power Unit from the packaging material.
Important
The Power Unit is heavy. BendPak recommends having one person hold the Power Unit
while a second person bolts it into place.
Put the Vibration Dampener into place next to the Mounting Bracket on the Powerside Post.
Move the Power Unit Mount Plate next to the Vibration Dampener.
Secure the Power Unit and Vibration Dampener using the hardware listed below, using all four
holes to secure the Power Unit.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...