Contact the Electrician
As mentioned previously, there are installation tasks that require a certified Electrician.
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician in accordance with
all applicable local electrical codes.
The Electrician needs to:
•
Connect to power
. The Power Unit comes with a pigtail for wiring to a power source. Have your
Electrician connect a power cord with plug to the electrical box on the Lift (for connection to a
power outlet) or have them wire it directly into the electrical system at the Lift location.
•
Connect the Microswitch to the Power Unit
. The Microswitch (which is next to the Safety
Shutoff Bar) must be wired to the Power Unit. The necessary wiring is included.
•
Install a Power Disconnect Switch
. Ensures you can quickly and completely interrupt
electrical power to the Lift in the event of an electrical circuit fault, emergency, or when equipment
is undergoing service or maintenance. You must put it within sight and easy reach of the Lift
operator. Refer to
Installing a Power Disconnect Switch
•
Install a Thermal Disconnect Switch
. Ensures the equipment shuts down in the event of an
overload or an overheated motor. Refer to
Installing a Thermal Disconnect Switch
more information.
These installation tasks are described in detail in the following sections.
The Electrician is responsible for providing:
•
A power cord and appropriate 220 VAC plug for connecting to an appropriate power source or the
items required to connect to the facility’s power system
•
a Power Disconnect Switch
•
a Thermal Disconnect Switch
Additional information is supplied in the following sections describing these tasks.
Electrical Information
⚠
DANGER
All wiring
must
be performed by a licensed, certified Electrician in accordance with
all applicable local electrical codes. Do not perform any maintenance until main
electrical power has been disconnected from the Lift and cannot be re-energized
until all procedures are complete.
Important electrical information:
•
Improper electrical installation can damage the Power Unit motor, which is not covered by the
warranty.
•
The Lift uses electrical energy; if your organization has Lockout/Tagout policies, make sure to
implement them after connecting to a power source.
•
Use a separate circuit breaker for each Power Unit.
•
Protect each circuit with a time delay fuse or circuit breaker:
–
For a 208 to 230 VAC,
single phase
circuit, use a 15-amp circuit breaker.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...