10AP Series Two-Post Lifts
40
P/N 5900265 — Rev. A6 — December 2022
To route the Equalizing Cables
:
Using a Forklift or Shop Crane, manually raise both Lift Heads about 28 inches / 711 mm off the
ground and engage them on the closest Safety Lock.
Measure to verify both Lift Heads are the same distance off the ground.
⚠
WARNING
You must use a proper lifting device such as a Forklift or Shop Crane to raise and
position the Lift components.
Make sure the Button Ends of both Equalizing Cables are still in the Slots in their Cable Button
Stops, that both Equalizing Cables go under the Post Sheave in their Posts, and that the Threaded
Ends have been routed through the Hole at the Top of the Lift Head.
If either cable is not correct, fix it; you cannot continue until the Equalizing Cables are in their
correct starting positions. Remember, for a Wide Configuration, use the Button End at the very end
of the Equalizing Cable. For a Narrow Configuration, use the Button End away from the end of the
Equalizing Cable.
Choose which one of the two Equalizing Cables you are going to put into position first, then
remove the Nut from the Threaded End of that Cable.
NOTICE
The Overhead Assembly Sheave, Sheave Pin, and Hair Pin were previously removed. If
they were mistakenly re-installed, you need to remove them again.
Route the Threaded End of the Equalizing Cable up on the inside of the Post, over the Overhead
Sheave Assembly, and then out over the top of the Overhead Assembly.
Lubricate the Sheave Pin and Bearing with Red Lithium Grease, then re-install the Overhead
Assembly Sheave, Sheave Pin, and Hair Pin.
At the other Post, remove the Nut from the Threaded End of the other Equalizing Cable.
Route the Threaded End over the top of the Overhead Assembly Sheave, and then down the Post
towards the Lift Head.
Lubricate the Sheave Pin and Bearing with Red Lithium Grease, then re-install the Overhead
Assembly Sheave, Sheave Pin, and Hair Pin.
Put the Threaded End of the Equalizing Cable through the hole at the top of the Lift Head, then
install the Nut and securely tighten.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...