10AP Series Two-Post Lifts
35
P/N 5900265 — Rev. A6 — December 2022
NOTICE
The holding strength of an Anchor Bolt is partially based on the how cleanly the
Expansion Sleeve presses against the Concrete. If the hole is dirty or too wide, there
is less holding strength.
Make sure the Washer and Nut are in place, then insert the Anchor Bolt into the hole.
The Expansion Sleeve of the Anchor Bolt may prevent the
Anchor Bolt from passing through the hole in the Base Plate;
this is normal. Use a hammer or mallet to get the Expansion
Sleeve through the Base Plate and into the hole.
Even using a hammer or mallet, the Anchor Bolt should only
go into the hole part of the way; this is normal. If the Anchor
Bolt goes all the way in with little or no resistance, the hole is
too wide.
Once past the hole in the Base Plate, the Anchor Bolt eventually stops going down into the hole as
the Expansion Sleeve contacts the sides of the hole; this is normal.
Hammer or mallet the Anchor Bolt the rest of the way down into the hole, and then stop when the
Washer is snug against the Base Plate.
Plumb each Post; install any needed Shims or the optional Adapter Trays (which let you stack the
provided Auxiliary Adapters — also called Extenders — conveniently near the Lift Arms).
Do not scale.
Tip
If you are going to torque the Anchor Bolts later, so that installing the Overhead Assembly
and final leveling is a little easier, skip the next step. Make sure the Anchor Bolts are
securely in position; This will ensure that the Posts will not move too much during the rest
of the installation.
Tighten each Nut
clockwise
to the recommended installation torque, 85 – 95 pound feet, using a
Torque Wrench.
⚠
CAUTION
Do
not
use an impact wrench to torque the Anchor Bolts.
Install the Foot Guard on the Powerside Post as shown above.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...