10AP Series Two-Post Lifts
39
P/N 5900265 — Rev. A6 — December 2022
Completing the Equalizing Cables Installation
Both Equalizing Cables should have been put into position coiled at the top of the Lift Posts before the
Posts were raised, which was covered in
Putting the Equalizing Cables into Position
This section picks up where that section left off: the Button Ends of the Equalizing Cables (on both
Posts) have been installed, routed around the Post Sheaves, and then pushed up above the Lift Head.
They now need to be routed over the Overhead Assembly and then down to the top of the Lift Head.
NOTICE
If your Equalizing Cables are not yet in position, you must go back and put them into position
before performing the following procedure.
When Equalizing Cables are fully routed, they are mirror images of each other. Refer to the figure
below.
Not to scale. Components removed for clarity.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...