10AP Series Two-Post Lifts
18
P/N 5900265 — Rev. A6 — December 2022
Installing the Safety Assemblies and Positioning the Safety
Lock Cable
Leaving both Lift Posts flat on the ground with access to the inside of the Post will ease the Safety
Lock installation and threading of the Safety Lock Cable into position. This procedure is intended to
leave the cable coiled at the top of the Offside Post, ready for routing after the Posts are standing. This
position will also make it easier to put the Equalizing Cables into position.
10AP Series Lifts have two Safety Assemblies: one on the Powerside Post (above the Power Unit) and
the other on the Offside Post at the same height.
The two Safety Assemblies engage the Lift head and prevent it from lowering. The Safety Release
mechanism allows the Lift Head to move past the Safety Locks and lower to the ground. The Safety
Assemblies must be disengaged
at the same time
so that both Lift Heads lower together. To
accomplish this, the two Safety Assemblies are connected to each other via a Safety Lock Cable,
which is routed through the Lift Posts and the Overhead Assembly.
The following illustrations display the Offside and Powerside Safety Mechanisms.
Offside Safety
: Similar to the Powerside
Safety, except that it does not have a Safety Lock
Release Handle.
Powerside Safety
: The Powerside Safety
includes a Safety Lock Release Handle and
spring, which is pushed down and used to
disengage the Safety Locks when lowering the
Lift.
Not to scale. Components removed for clarity.
Summary of Contents for Clearfloor 10AP
Page 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Page 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Page 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Page 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Page 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Page 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Page 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Page 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Page 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Page 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Page 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Page 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Page 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Page 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Page 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Page 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Page 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Page 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Page 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Page 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...