Operation and setting
46
3. If at a permanently connected DUT the resistance of the PE conductor is to be measured, make
the connection as follows:
How to perform zero balancing for measurement # 4:
– Insert the measuring cable (with test terminal if applicable) into bush “C”.
– Insert the passive test probe into bush “B” or active test probe into the colour-coded bushes
“B” and “A”.
– Contact the test probe with the end of the measuring cable (with test terminal if applicable).
– Start zero balancing by pressing “F2”.
4. A DUT has a permanently connected power supply cord. The connection is made in the same way
if a DUT with a detachable power supply cord is to be tested together with this cable.
How to perform zero balancing for measurement # 3:
– Insert the passive test probe into bush “B” or active test probe into the colour-coded bushes
“B” and “A”.
– Contact the test probe with the PE contact on test socket “E”.
– Start zero balancing by pressing “F3”.
Summary of Contents for UNIMET 1000ST
Page 50: ...Operation and setting 50 TGH1256en 10 2005...
Page 80: ...PC compatible functions of the UNIMET 1100ST 80 TGH1256en 10 2005...
Page 82: ...Maintenance and calibration 82 TGH1256en 10 2005...
Page 90: ...Options and accessories 90 TGH1256en 10 2005...
Page 96: ...Data 96 TGH1256en 10 2005...
Page 99: ......