Installing the Carriers
2-26
Installation, SPM, Maintenance, and Troubleshooting Supplement
Figure 2-6. Fastening the left and right brackets on the carrier
4.
Place the carrier on to the horizontal mounting bracket approximately 2
inches to the right of its final position.
The hook on the back of the carrier should rest on the top flange of the
horizontal mounting bracket.
5.
Slide the carrier to the left until it stops when it bottoms out on the vertical
mounting bracket.
Make sure that the bottom of the carrier is secured by the vertical mounting
bracket.
6.
Secure the left and right mounting brackets to the backboard with a
minimum of one 10 X 3/4” long wood screw in each bracket as shown in
Figure 2-7.
7.
Connect the ground-screw on the carrier to an approved ground by using a
#12 AWG or #14 AWG solid copper wire. See Figure Figure 2-3 on page
2-13.
Summary of Contents for Lucent Technologies MERLIN MAGIX
Page 2: ......
Page 6: ......
Page 12: ......
Page 24: ...PCMCIA Translation Card 1 12 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 162: ...Installing the E911 Adjunct 6 8 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 178: ...PCMCIA Upgrade Card 7 16 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 266: ...Flow Control 8 88 Installation SPM Maintenance and Troubleshooting Supplement ...