Tests
4-30
Installation, SPM, Maintenance, and Troubleshooting Supplement
Tests
4
Three new Tests apply to both the 100R INA and 100 DCD modules:
■
Line loopback
Three other tests have been added specifically for the 100 DCD module:
Line Loopback Test
4
This test loops the T1 interface back towards the network on the network side
of the framer. To perform this test, you must first busy-out the module. From
your system programming console, use the following sequence to access the
Line loopback test.
Menu:
Maintenance
→
Slot
→
Slot#
→
Enter
→
Demand
test
→
LineLpbk
If you have not busied out a module when the test requested needs to
have the module busied-out, you receive the following error message:
“Failed Slot is not busied out”
When this test is activated, the far end generates the test pattern using
the built-in BERT Tests or other data-generating equipment.
Summary of Contents for Lucent Technologies MERLIN MAGIX
Page 2: ......
Page 6: ......
Page 12: ......
Page 24: ...PCMCIA Translation Card 1 12 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 162: ...Installing the E911 Adjunct 6 8 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 178: ...PCMCIA Upgrade Card 7 16 Installation SPM Maintenance and Troubleshooting Supplement ...
Page 266: ...Flow Control 8 88 Installation SPM Maintenance and Troubleshooting Supplement ...