4
Installation MACH1000
Release 07 08/2022
2.1
Checking the package contents
37
2.2
Installing an SFP transceiver (optional)
37
2.3
Wiring of the terminal blocks for supply voltage and signal
contact
38
2.3.1 Connecting the voltage supply terminals (power
supply units “C” and “G”)
38
2.3.2 Connecting the plugged voltage supply (power
supply units “L” and “M”)
41
2.3.3 Wiring the signal contact
42
2.4
Installing and grounding the device
44
2.4.1 Mounting in a switch cabinet
44
2.4.2 Vertical mounting on the wall
46
2.4.3 Grounding the device
46
2.5
Operating the device
47
2.6
Connecting data cables
47
2.6.1 Twisted Pair ports
47
2.6.2 Optical fiber ports
47
3
Making basic settings
48
4
Monitoring the ambient air temperature
49
5
Maintenance and service
50
6
Disassembly
51
6.1
Removing the device
51
6.2
Removing an SFP transceiver (optional)
51
7
Technical data
52
A
Further support
66
Summary of Contents for Hirschmann MACH1000 Series
Page 67: ...Installation MACH1000 Release 07 08 2022 67 ...
Page 68: ......