8.2 Commissioning work
The following requirements must be fulfilled to carry out commissioning work and preparatory work must be completed.
Preconditions
Tool
Material
Protective equipment
• none
• none
•
none
Preparatory work
1.
Completed installation with leak test
Picture
Description
Automatic drainage
Mechanically open
1.
Turn knurled screw on the float drain from
"Mechanically open"
counterclockwise
(left-hand thread) to
"Automatic
drainage"
.
CLEARPOINT
®
3
eco
coalescing filter
Installation and operation instructions