background image

BEAR | 2017 | 

page 18

12.3. 

When performing the maintenance, the water distiller should be disconnected 

from the mains.

12.4.  The routine maintenance during the operation period shall be carried out by staff that 

uses the distiller, the periodical maintenance shall be performed by qualified personnel 

(electrician and mechanic). Routine maintenance is an external visual inspection of the 

uni

t

 and removal of dust, dirt, corrosion with a dry clean cloth and inspecting visually 

the filter located in the valve 25 (Figure 2) for clogging. In case of clogging, rinse it with 

water. 

12.5.  After 160 hours of operation (depending on raw water quality) or decreased water 

distiller performance, the evaporation chamber and electric heaters should be cleaned 

of scale using a non-destructive method when checking the housing and heating 

elements. 

12.6. 

Recommendations for cleaning up:

12.6.1.   Close the valve for the raw water supply to the water still from the water sup-

ply system. 

12.6.2.  Drain water from the evaporator using the tap 27 (Figure 2) (do not close the 

tap after the drain).

12.6.3.  Remove the upper cover of the water still housing.
12.6.4.  Remove the evaporator 2 cover  (Figure 1).
12.6.5.  Unscrew 4 attachment nuts of the steam flow splitter 3 (Figure 1).
12.6.6.  Remove the steam flow splitter 3.
12.6.7. 

Flush with water the walls and bottom of the evaporator to remove salt-con-

taining sediments. You can use the filling hose for supplying raw water from 

the water supply system: for this, undo the nut of the filling hose from the 

connection of the solenoid valve 25 (Figure 2), remove the gasket from the 

nut, turn the tap for supplying raw water. 

12.6.8.  Close the tap 27 for the drain of waste water from the evaporator (Figure 2).
12.6.9.  Fill the evaporator with pure water up to the level of Evaporator low water 

level sensor (the bottommost sensor)

12.6.10.  Add citric acid into the evaporator, at a rate of 50 g per liter. The volume of 

water in the evaporator is 5 l for the BEAR B 1104, 15 l for the BEAR B 1110, 

25 l for the BEAR B 1125. Instead of citric acid solution, you can use other 

household means intended for descaling. In the application of other means, 

follow the instructions for the use of these means.

12.6.11.  Ensure that the sensors 9, 23, 24 (Figure 1) are fixed firmly and do not con-

tact the walls. 

12.6.12.  Ensure that the valve for the raw water supply from the water supply system 

is CLOSED.

12.6.13.  Place the evaporator cover back.
12.6.14.  Switch the water still when pushing the POWER button.
12.6.15.  Bring to a boil and boil for 10 minutes.
12.6.16.  Switch the water still OFF.
12.6.17.  In 60 min open the valve 27 (Figure 2) and drain the solution. 

Summary of Contents for A 1104

Page 1: ...Water Distillers OPERTION MANUAL A 1104 A 1110 A 1125 A 1204 A 1210...

Page 2: ...ke modifications to the design of the water distiller Be careful water distiller surfaces and distillate can be extremely hot while operating Use only original accessories and parts heaters valves con...

Page 3: ...controlled by personnel all the time while operating Make sure that distillate receptacle is big enough and not full before starting operation 2 General information 2 1 Water distillers BEAR B 1104 BE...

Page 4: ...Due to heaviness of BEAR B 1110 and BEAR B 1125 those models should be unpacked by 2 persons For BEAR B 1110 and BEAR B 1125 the easiest way is to disassemble the wooden crate and then remove the pal...

Page 5: ...n hose inlet hose length 2 meters 1 Water connection hose drain hose length 1 5 meters 16x25 mm 2 Fitting with male thread 12 mm 2 Silicone tube for constant distillate withdrawal 15x3 mm length 1 met...

Page 6: ...1 Fitting with male thread 12 mm 1 Metal water connection hose inlet hose length 1 5 meters 1 Water connection hose drain hose length 1 5 meters 2 Silicone tube for constant distillate withdrawal 16x2...

Page 7: ...ler design the structure component view is schematic not taking into considera tion features of the water stills Figure 2 shows the fitting grounding terminal connection diagram 4 Water distiller with...

Page 8: ...changer inlet 16 Evaporator inlet 17 Heater 18 Equalizer drain pipe 19 Heat exchanger 20 Condenser drain pipe 21 Raw water supply valve 22 Collector distillate level pipe 23 Evaporator top level senso...

Page 9: ...vaporator 2 steam forms then separated and enters in the condenser 6 via the channel 5 The separator consists of the steam floe splitter 3 and the nozzle 4 located inside the channel 5 4 4 Steam conde...

Page 10: ...utomatic device switches the heater OFF at the same time the switch led HEATER turns off 5 5 The Low water thermostat sensor 10 Figure 1 ensures an additional emergency shut down of the water still in...

Page 11: ...sideration features of the water stills 6 Water distiller without built in tank design and principle of operation 1 Housing 2 POWER switch 3 Electric heater s 4 Low water thermostatic sensor 5 Distill...

Page 12: ...ld be used to collect distillate 7 Before installation Installation of the equipment must be done only by qualified personnel and only after reading this operating manual 7 1 The water distillers are...

Page 13: ...IGH WATER LEVEL red LED will light up 8 6 Install gaskets in the filling hose nuts if they ar not pre installed at the factory 8 7 Connect the filling hose to the fitting 25 Figure 2 8 8 Connect the f...

Page 14: ...14 Connect the water still grounding terminal to the PG bus with flexible copper wire at least 6 mm2 in cross section Connect the external circuits to the power supply network in accordance with Figur...

Page 15: ...re Equalizer is about 70 80 degrees Celsius 9 5 Install water distiller on the table using the level gauge and avoiding slants 9 6 Attach the silicone tube L 0 5 m to the distillate drain pipe 5 9 7 C...

Page 16: ...s an overflow of water and turn off the water still and the HIGH WATER LEVEL LED will be lit 10 7 To start the water distiller push the POWER button located on the front panel and this button should b...

Page 17: ...d down and then push the lock button located on the thermal switch housing Pos 13 Figure 5 11 6 To start the water still push the POWER button located on the front panel and this but ton should be lit...

Page 18: ...splitter 3 Figure 1 12 6 6 Remove the steam flow splitter 3 12 6 7 Flush with water the walls and bottom of the evaporator to remove salt con taining sediments You can use the filling hose for supplyi...

Page 19: ...12 6 28 Make sure that the sensors 9 23 Figure 1 is rigidly fixed and do not contact the walls 12 6 29 Assembly the water still performing steps 4 3 in reverse order 12 6 30 The water still can be use...

Page 20: ...evaporator with water add cleaning solution for descaling Close the raw water supply valve Bring to a boil and boil for 10 20 minutes Then after 60 minutes drain the solution 13 5 Rinse with water an...

Page 21: ...ARS Guarantee mentioned above is limited for the heaters for 6 months 16 2 Service Maintenance of the distillers should be performed by qualified personnel Distiller serial number_____________________...

Page 22: ...Contact Info Location 5115 Douglas Fir Road Suite G Calabasas California 91302 USA Phone 424 259 0816 E mail info bearinnovation com...

Reviews: