8. Water distiller with built in tank installation

8.1.  

Attach the fitting with 1/2’’ male thread through the sealing tape to the tap 28 (Figure 2). 
Connect the silicone tube to the fitting and attach a plastic tie

8.2.   Attach the fitting with 1/2’’ male thread through the sealing tape to the tap 27 (Figure 

2).

8.3.   Connect the drain hose. First one to the fitting 26 for the cooling water drain (Figure 2). 

This hose should be connected all the time. Another hose connect to the tap fitting 27 
for the wastewater drain from the evaporator (This hose can be connected only while 
cleaning and descaling the distiller). Tighten the connections of hoses and fittings with 
the clamps supplied. 

8.4.   IMPORTANT! The hose for the cooling water drain from the 

fitting 26 (Figure 2) should be located at a slant and it must not 
have any twists and kinks. If necessary, shorten the hose. The 
level difference between the fitting 26 and the location of the 
hose connection to the sewage system should be at least 0.3 m. 
The hose should not abut against the internal sewage pipe wall.

8.5.   Otherwise, the water level in the evaporator 2 (Figure 1) and equalizer 7 begins to rise 

and reaches the top level sensor 23 or level sensor 24 and the automatic controller will 
stop the water distiller and the HIGH WATER LEVEL red LED will light up).

8.6.   Install gaskets in the filling hose nuts (if they ar not pre-installed at the factory).
8.7.   Connect the filling hose to the fitting 25 (Figure 2). 
8.8.   Connect the filling hose to the raw water supply system through a valve or a ball valve. 
8.9.   Check, that the bottom level sensor 9 (Figure 1) does not contact the walls of the 

evaporator 2 and steam flow splitter 3. Otherwise, the heaters start to operate in the 
absence of a sufficient water level. This will cause an emergency shutdown of the water 
distiller due to the electric heater temperature rise above 150 °C. 

8.10.  Check, that the distillate level sensor 11 (Figure 1) does not contact the walls of the 

condenser 6 and exchanger 19. Otherwise, the automatic controller will assume that 
the collector is filled with distillate, turn off water heating, and shut the inlet water supply 
valve off.

8.11.   Check that the sensors 23 (Figure 1) and 24 do not contact the walls of the evaporator 

2 and equalizer 7. Otherwise, the automatic device would assume that there was an 
overflow of water and turn off the water distiller, and the HIGH WATER LEVEL LED will 
be lit.

8.12.   Before connecting to the mains, make sure that the voltage and power correspond 

with the information on the water distillers. The mains should be equipped with a circuit 
breaker in accordance with the water distiller power (NOT LESS THAN 10 A for BEAR A 
1104, 25 A for BEAR A 1110 and 55 A for BEAR A 1125). The water still is connected to 

Summary of Contents for A 1104

Page 1: ...Water Distillers OPERTION MANUAL A 1104 A 1110 A 1125 A 1204 A 1210...

Page 2: ...ke modifications to the design of the water distiller Be careful water distiller surfaces and distillate can be extremely hot while operating Use only original accessories and parts heaters valves con...

Page 3: ...controlled by personnel all the time while operating Make sure that distillate receptacle is big enough and not full before starting operation 2 General information 2 1 Water distillers BEAR B 1104 BE...

Page 4: ...Due to heaviness of BEAR B 1110 and BEAR B 1125 those models should be unpacked by 2 persons For BEAR B 1110 and BEAR B 1125 the easiest way is to disassemble the wooden crate and then remove the pal...

Page 5: ...n hose inlet hose length 2 meters 1 Water connection hose drain hose length 1 5 meters 16x25 mm 2 Fitting with male thread 12 mm 2 Silicone tube for constant distillate withdrawal 15x3 mm length 1 met...

Page 6: ...1 Fitting with male thread 12 mm 1 Metal water connection hose inlet hose length 1 5 meters 1 Water connection hose drain hose length 1 5 meters 2 Silicone tube for constant distillate withdrawal 16x2...

Page 7: ...ler design the structure component view is schematic not taking into considera tion features of the water stills Figure 2 shows the fitting grounding terminal connection diagram 4 Water distiller with...

Page 8: ...changer inlet 16 Evaporator inlet 17 Heater 18 Equalizer drain pipe 19 Heat exchanger 20 Condenser drain pipe 21 Raw water supply valve 22 Collector distillate level pipe 23 Evaporator top level senso...

Page 9: ...vaporator 2 steam forms then separated and enters in the condenser 6 via the channel 5 The separator consists of the steam floe splitter 3 and the nozzle 4 located inside the channel 5 4 4 Steam conde...

Page 10: ...utomatic device switches the heater OFF at the same time the switch led HEATER turns off 5 5 The Low water thermostat sensor 10 Figure 1 ensures an additional emergency shut down of the water still in...

Page 11: ...sideration features of the water stills 6 Water distiller without built in tank design and principle of operation 1 Housing 2 POWER switch 3 Electric heater s 4 Low water thermostatic sensor 5 Distill...

Page 12: ...ld be used to collect distillate 7 Before installation Installation of the equipment must be done only by qualified personnel and only after reading this operating manual 7 1 The water distillers are...

Page 13: ...IGH WATER LEVEL red LED will light up 8 6 Install gaskets in the filling hose nuts if they ar not pre installed at the factory 8 7 Connect the filling hose to the fitting 25 Figure 2 8 8 Connect the f...

Page 14: ...14 Connect the water still grounding terminal to the PG bus with flexible copper wire at least 6 mm2 in cross section Connect the external circuits to the power supply network in accordance with Figur...

Page 15: ...re Equalizer is about 70 80 degrees Celsius 9 5 Install water distiller on the table using the level gauge and avoiding slants 9 6 Attach the silicone tube L 0 5 m to the distillate drain pipe 5 9 7 C...

Page 16: ...s an overflow of water and turn off the water still and the HIGH WATER LEVEL LED will be lit 10 7 To start the water distiller push the POWER button located on the front panel and this button should b...

Page 17: ...d down and then push the lock button located on the thermal switch housing Pos 13 Figure 5 11 6 To start the water still push the POWER button located on the front panel and this but ton should be lit...

Page 18: ...splitter 3 Figure 1 12 6 6 Remove the steam flow splitter 3 12 6 7 Flush with water the walls and bottom of the evaporator to remove salt con taining sediments You can use the filling hose for supplyi...

Page 19: ...12 6 28 Make sure that the sensors 9 23 Figure 1 is rigidly fixed and do not contact the walls 12 6 29 Assembly the water still performing steps 4 3 in reverse order 12 6 30 The water still can be use...

Page 20: ...evaporator with water add cleaning solution for descaling Close the raw water supply valve Bring to a boil and boil for 10 20 minutes Then after 60 minutes drain the solution 13 5 Rinse with water an...

Page 21: ...ARS Guarantee mentioned above is limited for the heaters for 6 months 16 2 Service Maintenance of the distillers should be performed by qualified personnel Distiller serial number_____________________...

Page 22: ...Contact Info Location 5115 Douglas Fir Road Suite G Calabasas California 91302 USA Phone 424 259 0816 E mail info bearinnovation com...

Reviews: