![Baxi Senertec Dachs Pro 20 ST Assembly And Operation Manual Download Page 93](http://html.mh-extra.com/html/baxi/senertec-dachs-pro-20-st/senertec-dachs-pro-20-st_assembly-and-operation-manual_2712016093.webp)
14/4798.495.002
Commissioning | 93
Dachs Pro 20 ST
Additional preparations for commissioning:
55. Has the application at the energy provider (EVU) been prepared and sent in time?
56. Has the application at the German Federal Office for Economic Affairs and Export Control (BAFA) been
prepared and sent in time?
Comments
HEATING, executing
company
________________
Date
_______________________
Signature
ELECTRICS, executing
company
________________
Date
_______________________
Signature
Reference:
Please observe the supplementary instructions and information in the iav
Documentation of VW on the EcoBlue 2.0 (Generation 1.2) -
Chapters 11.1 and 11.2
in
particular.
Note:
After commissioning, the manufacturer label is to be installed at the Dachs Pro 20 ST overall system.
By attaching the manufacturer label (adhesive label) to the housing of the CHP unit, the installer confirms proper
installation of the unit according to the manufacturer documentation and the specified safety instructions.
Amongst others, The fabrication number (S/N) specified on the manufacturer label is required for unit identification
in case of servicing. Reorders are
not
possible.
i
Summary of Contents for Senertec Dachs Pro 20 ST
Page 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Page 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Page 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Page 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...