![Baxi Senertec Dachs Pro 20 ST Assembly And Operation Manual Download Page 82](http://html.mh-extra.com/html/baxi/senertec-dachs-pro-20-st/senertec-dachs-pro-20-st_assembly-and-operation-manual_2712016082.webp)
14/4798.495.002
82 | Installation
Dachs Pro 20 ST
F5, F6 and F7 sensor connection
►
Position and assemble the sensors F5, F6 and F7 at the
installation on site according to the hydraulic schematic
diagrams. For sensor mounting, suitable tension straps are
provided in the scope of delivery of the unit.
►
Route the sensor lines to the MSR Pro 20 ST.
Please note the dimensioning of the sensor line according to
the distance to the F5, F6 and F7 sensors.
►
Insert the sensor line from the bottom into the controller.
►
Connect the connection liens of the sensor cable harnesses to
the respective
X2a, X2b, X2c
connectors.
Sensor F5 - connection to X2a
Sensor F6 - connection to X2b
Sensor F7 - connection to X2c
►
Secure the sensor lines with cable ties at the bottom stress relief
rail of the MSR Pro 20 ST.
Fig. 80: Schematic diagram - Sensor cable harness extension
Distribution box to be
provided for extension
F3 and F4 connection to X1d and X1e
On-site cable extension (if required)
Sensor cable harness 2
Sensor cable harness 1
Sensor cable harness length in scope of delivery
(5 m)
powered by
Volks
V
V
wagen
F1
F2
F3
F4
Connector
F1 and F2 connection to X1b and X1c
Connector
Connector
Connector
Fig. 81: F5, F6 and F7 sensor connection
Fig. 82: Contact sensor and tension strap
Summary of Contents for Senertec Dachs Pro 20 ST
Page 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Page 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Page 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Page 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...