14/4798.495.002
84 | Installation
Dachs Pro 20 ST
CAN bus cable harness connection
Route and install the CAN bus cable harness
provided in the scope of delivery.
►
Remove one stepped nipple at the
rear of the controller housing.
►
Insert the cable harness from the
outside into the controller.
►
Secure the stepped nipple of the cable
harness inside the controller housing.
►
Route the cable harness to the
controller PCB as illustrated.
►
Connect the connector to the
left
port
at the controller PCB.
►
Secure the cable harness as illustrated
with two cable ties and the rubber lug
at the controller housing.
►
Secure the connection line with 2
cable ties at the strain relief rail.
►
Route the cable harness to the CHP
and connect it to the E-Module as
illustrated.
Note:
The communication between CHP
and MSR Pro 20 ST is realised via a
CAN bus connection.
i
Fig. 86: CAN bus cable harness
Fig. 87: CAN connection in the MSR Pro 20 ST
Fig. 88: CAN connection port at CHP
Attention:
Make sure that the connection line
is routed without tension and that
the controller hatch can be opened
and closed freely.
!
- CHP connection -
Individual single conductors
with end sleeves
- MSR Pro 20 ST connection
-
Plug connection
Summary of Contents for Senertec Dachs Pro 20 ST
Page 115: ...14 4798 495 002 Spare parts 115 Dachs Pro 20 ST Notes ...
Page 116: ...14 4798 495 002 116 Spare parts Dachs Pro 20 ST Notes ...
Page 117: ...14 4798 495 002 Spare parts 117 Dachs Pro 20 ST Notes ...
Page 118: ...Dachs Pro 20 ST Baxi Commercial Wood Lane Erdington Birmingham B24 9QP ...