![Baltimore Aircoil Company TrilliumSeries TRF Operation & Maintenance Manual Download Page 32](http://html1.mh-extra.com/html/baltimore-aircoil-company/trilliumseries-trf/trilliumseries-trf_operation-and-maintenance-manual_3617020032.webp)
TrilliumSeries™ Adiabatic
Cooler - TRF Operation & Maintenance Manual
–
Component Information & Maintenance
Page | 32
4.
Remove caps from the cable glands. Label and remove wiring from terminal blocks shown in
. Carefully tag
these wires properly to ensure that they are connected at the same location on the new fan. These wires carry
polarity sensitive signals.
Figure 17. Terminal Block Diagram
5.
Remove wires from terminal box and cable glands. Cut zip cable ties securing wiring to fan assembly.
6.
Remove the (8)
9/16” bolts securing the fan and motor assembly to the fan deck
as shown in
Figure 18. Fan Deck Fasteners