© 2020 Baker Hughes Company. All rights reserved
.
=
Masoneilan SVI II AP Digital Positioner Quick Start Guide | 42
5. Ensure the turnbuckle assembly is parallel to the stem and
the magnets are in the valve closed position (Figure
and connect to take-off bracket.
Figure 21
Magnet Position with Valve Closed
6. Verify lever is in correct position with valve closed. Adjust
rod-ends, if necessary.
Figure 22
Lever Alignment
7. Mount the SVI-II with M6-1 screws.
8. Cycle the valve open to close verifying proper components
movement and that rod-ends move free and clear from
other components.
Summary of Contents for Masoneilan SVI II AP Series
Page 6: ...This page intentionally left blank ...
Page 76: ...This page intentionally left blank ...
Page 82: ...This page intentionally left blank ...
Page 108: ...This page intentionally left blank ...
Page 122: ...This page intentionally left blank ...