![background image](http://html1.mh-extra.com/html/backyard-products/yardline-16549/yardline-16549_manual_3363726049.webp)
47
PARTS REQUIRED:
DORMER WALL & OVERHANG FRAMES
FINISH
5
You have finished building your dormer wall and overhang frames.
BEGIN
¸
1
24"
(61) cm)
24"
(61) cm)
72"
(182,9) cm)
24"
(61) cm)
x2
2 x 4 x 14-5/16" (5,1 x 10,2 x 36,4 cm)
KFA
x4
2 x 4 x 2-7/8"
(5,1 x 10,2 x 7,3 cm)
KDA
x2
2 x 4 x 71-1/8" (5,1 x 10,2 x 180,7 cm)
KGA
x2
2 x 4 x 72" (5,1 x 10,2 x 180,7 cm)
TM
Use two 3" nails at each mark.
Orient parts on edge on floor. Measure and mark.
Orient
KDA
and TM
overhang parts on edge on floor
(Fig. A)
. Measure and mark.
2
3
3" (7,6 cm)
Nails
KFA x4
14-5/16"
(36,4 cm)
36-9/16"
(92,9 cm)
36-9/16"
(92,9 cm)
71-1/8"
(180,7cm)
HINT:
For easier nailing
stand on frame.
KGA
KDA x4
TM
x32
3" (7,6 cm)
Flush
Use two 3" nails at each mark.
4
Fig. A
3" (7,6 cm)
Nails
Flush
Flush