41
GABLE END WALL INSTALLATION
PARTS REQUIRED:
6"
(15,2 cm)
6"
(15,2 cm)
6"
(15,2 cm)
Fig. C
You have finished standing your second gable end wall.
Secure gable wall
to floor using 3" nails
(Fig. E)
.
Nail gable wall panels to front and back wall
studs using 1-1/2" nails 6" apart
(Fig. E )
.
2"
(5,1 cm)
Nails
Angle nail
to hit floor
frame.
FINISH
7
4
3
5
6
1-1/2"
(3,8 cm)
Nails
Fig. F
3" (7,6 cm)
Screw
Fig. E
Secure gable wall top frame 2 x 4 using 3" screws
toe-screwed at each corner into top wall frames at
an angle as shown in
(Fig. F)
.
3" (7,6 cm)
Nails
Nail lower edge of panels to floor using 2" nails 6" apart. Angle nail to hit floor frame
(Fig. C)
.