![background image](http://html1.mh-extra.com/html/backyard-products/yardline-16549/yardline-16549_manual_3363726053.webp)
51
PARTS REQUIRED:
DORMER
FINISH
17
You have finished pre-assembling your dormer. Proceed to install roof panels.
Place pre-assembled overhang unit
between truss ends as shown. Ensure overhang unit is flush
with ends.
Secure with 3" screws.
●
HINT:
Use a "C" clamp at each side to hold frame flush and square with trusses during installation.
16
x1
3" (7,6 cm)
x4
Pre-assembled overhang frame
Pre-assembled
overhang unit
3" (7,6 cm)
Screws
Flush
Flush