Parts needed:
• (1) BOUNCE TUBE ASSEMBLY
Bounce Tube Attachment
Phase 33
Hardware needed:
• (4) KJ - EYEBOLT LAG WH 5/16x2 - H100135
• (4) CD- WASHER FLAT 8x27 - H100105
Phase Notes
• Assemble with hardware as shown.
BOUNCE TUBE ASSEMBLY
KJ
KJ
CD
CD
KJ
KJ
CD
CD
E6
E11
E11
E11
E11
Step 1: Insert 'KJ' Eyebolt Lag
into 'CD' Washer Flat 8X27
and into 'E11' fort braces, as
shown.
6-7/16"
Approx.
Step 2: Insert quick clip from
bounce tube assembly into
'KJ' Eyebolt Lag previously
inserted to all (4) 'E11' fort
braces, as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.